• Installed new solar-operated crosswalk signage in two new locations.
  • Completed approximately 54 acres of fire fuel reduction.
  • Relocated the pool slide and constructed the new Slide Landing Pool.
  • Sanded, primed and repainted the pool stairs.
  • Completed a major repair to the irrigation system that comprised approximately 600 feet of underground piping.
  • Completed new tree and irrigation mapping throughout the community.
  • Completed a thorough review of the SGCC equipment, including water usage. Also, initiated a new system for determining the electrical usage which resulted in a substantial savings for the association.
  • Completed rockery wall repairs on Gypsy Hill Trail, including relocating the fire hydrant located next to the wall.
  • Purchased new umbrellas, stands and sunshades for the pool deck.
  • Completed pavement maintenance on the trails (crack sealing only) within the internal Sierra Canyon trail network (non-MEA areas).
  • Awarded the SOA common area maintenance contract to BrightView.
  • Completed an operational assessment on the irrigation controllers.
  • Reestablished tree rings around all trees in common area turf areas.
  • Repainted the play pool water features.
  • Installed over 200 new trees in the community.
  • Installed over 1300 new water-efficient irrigation heads, each with a built-in pressure regulator and check valve.
  • Installed six new web-based irrigation controllers with weather-control features.
  • Replaced massage room flooring.
  • Replaced oven in the Club kitchen.
  • Retrofitted the exterior lighting in the Club parking lot to energy-efficient lighting.
  • Purchased new golf cart for maintenance.
  • Purchased and installed new fitness equipment at the Club.